Use case · Data Centers
Up and running before the grid says yes
The utility often says 18 – 24 months. Battery power gets you running now, and stays on as permanent capacity when you are ready to expand.
What you get
Energize before the grid says yes
Beat the queue
Revenue starts when your racks power on, not when the utility reaches your application.
The battery layer
Ride-through, peak support, and power quality smoothing alongside your gensets, silent and instant.
Scale on your timeline
Units run in parallel, so systems combine for multi-megawatt-hour deployments. Add capacity as you grow, without waiting on the wires.
Built the way you build
Add power in the increments your phases actually need, instead of buying capacity years before you use it.
Redundancy you can add to
Units run in parallel, so capacity and backup grow together as the load does.
Two schedules. Pick yours.
Both paths end at the same grid connection. One of them is earning for up to two years first.
Same connection. Months of revenue apart.
Power your data centerPower for every stage.
Bridge the wait for your grid connection, support peak loads once it arrives, and stay on as backup after that.
30 years of power electronics manufacturing.
Made in Canada, available across North America.
FAQ
Frequently asked questions
Can I run a data center before the grid connection is ready?
Yes, on-site battery power closes the gap that often runs 18 – 24 months.
What happens when we expand?
The same system stays on as permanent capacity.
Next step
Power your data center
Tell us about your site. Our commercial team will come back with a plan, a quote, and any rebates you qualify for.
Contact us directly
- Phone: +1 (778) 217-1423
- Email: info@soneilspark.com
- Location: Toronto, ONCA
Not sure where to start?
Send us what you know. We'll help identify the right next step.
Have a project like this?
Tell us about your site and our team will scope the right mix of charging and energy.