Use case · Construction

Power and charging the day you break ground

Keep every machine working through the day: DC fast charging (Level 3) on site puts electric equipment back to the job, with no power hookup to arrange and no generator to haul.

What you get

Site power the day you break ground

Charge the machines, power the site

The Mobile Charging Trailer fast-charges electric excavators, loaders, and trucks, and powers the trailer, tools, and lights, from one unit.

Hybrid from day one

Pair with your existing genset: the battery carries the load and the generator runs a fraction of the hours, so fuel runs and service visits drop with it. Charging and discharging at the same time means the unit works while it refills.

Moves with the work

Tow it to the next phase or the next site. Nothing gets left in the ground.

Hours, not months.

A utility connection is measured in months. The trailer is measured in hours.

Wait for a utility connection months
Apply
Design & approvals
Connected
Tow the trailer on site hours
Every working day in between, your equipment stays charging
Energized

Same site, powered. Months of workdays apart.

Power your job site

Over 3.5 million chargers built since 1994

Made in Canada, available across North America.

FAQ

Frequently asked questions

Can I charge electric equipment on a site with no grid hookup?

Yes, the trailer brings its own power, so there is nothing to arrange.

How fast does it charge equipment?

Fast charging (Level 3) puts equipment back to work in about an hour.

Can it move between sites?

Yes, it is towable and follows the project.

Next step

Power your job site

Tell us about your site. Our commercial team will come back with a plan, a quote, and any rebates you qualify for.

Contact us directly

Not sure where to start?

Send us what you know. We'll help identify the right next step.

Have a project like this?

Tell us about your site and our team will scope the right mix of charging and energy.