Use case · Construction
Power and charging the day you break ground
Keep every machine working through the day: DC fast charging (Level 3) on site puts electric equipment back to the job, with no power hookup to arrange and no generator to haul.
What you get
Site power the day you break ground
Charge the machines, power the site
The Mobile Charging Trailer fast-charges electric excavators, loaders, and trucks, and powers the trailer, tools, and lights, from one unit.
Hybrid from day one
Pair with your existing genset: the battery carries the load and the generator runs a fraction of the hours, so fuel runs and service visits drop with it. Charging and discharging at the same time means the unit works while it refills.
Moves with the work
Tow it to the next phase or the next site. Nothing gets left in the ground.
Hours, not months.
A utility connection is measured in months. The trailer is measured in hours.
Same site, powered. Months of workdays apart.
Power your job siteProducts used
The system behind it.
Over 3.5 million chargers built since 1994
Made in Canada, available across North America.
FAQ
Frequently asked questions
Can I charge electric equipment on a site with no grid hookup?
Yes, the trailer brings its own power, so there is nothing to arrange.
How fast does it charge equipment?
Fast charging (Level 3) puts equipment back to work in about an hour.
Can it move between sites?
Yes, it is towable and follows the project.
Next step
Power your job site
Tell us about your site. Our commercial team will come back with a plan, a quote, and any rebates you qualify for.
Contact us directly
- Phone: +1 (778) 217-1423
- Email: info@soneilspark.com
- Location: Toronto, ONCA
Not sure where to start?
Send us what you know. We'll help identify the right next step.
Have a project like this?
Tell us about your site and our team will scope the right mix of charging and energy.


